Page 98 - Calculating Agriculture Cover 20191124 STUDENT - A
P. 98

9-8                          Land, Soils and Fertilizers                            CH 9]






                                                     LAND DESCRIPTION DIAGRAM
                                                                       1
                                                                                   1
                                                                             1
                                                  The property located at N / 2, NW / 4, SW / 4,
                                                      1
                                                    SE / 4, Section 15 of T4N,R4E, Principal
                                                          Meridian and Base Line.
                                                               Figure 9.9

                  STANDARD     T5N    PARALELL

                               T4N                                 Township T4N,R4E
                                                                    36 square miles
                                 T3N                           6  5     4   3    2   1
                              PRINCIPAL   MERIDIAN   T2N   GUIDE       MERIDIAN     7  8  9  10  11  12




                    BASE       T1N    LINE                     13  14    15  16  17  18    6 miles


                               T1S


                               T2S                           19   20   21   22  23   24
                 R3W  R2W  R1W  R1E  R2E  R3E  R4E  R5E      25   26   27   28  29   30

                                                             31   32   33   34  35   36
                 Tiers and Ranges from Principal Meridian
                 and Base Line Identify Townships.                      6 miles
                                                                     Section 15— 640 acres






                How to locate a Property described as:

                        1
                             1
                                 1
                  1
                 N / 2, NW / 4, SW / 4,SE / 4, Section
                 15 of T4N,R4E, Principal Meridian
                 and Base Line.

                Is illustrated on this page and explained
                on Page 9-9 under DETERMINING
                ACREAGE FROM DESCRIPTION                                                                       1 mile







                                                                                  5  ACRES







                                                                            1 mile
                                               INSTRUCTOR Copyrighted Material
   93   94   95   96   97   98   99   100   101   102   103